Home
Photos 2-9 show how the layout was built.
Taken from the trainroom entrance - as the layout looks today.
Basic L girder benchwork installed. Ready for trackwork.
Mainline track and wiring installed and undergoing reliability testing
Another part of layout showing newspaper under-layment used to create basic terrain features and some hard shell plaster.